Chinese New Year shuts factories for weeks, and Golden Week jams the ports. Here is the full 2026 China holiday calendar for importers, with real timeline math, order deadlines, and a month-by-month planning table.

Ask a first-time importer how long China stops working for Chinese New Year and the answer is usually "about a week." That guess costs people real money every February. The official break in 2026 runs nine days, February 15 to 23, but if your production plan only accounts for nine days, you will be late. Factories wind down roughly a week before the holiday, reopen in a trickle, and are rarely back to full strength until early March. The realistic blackout is closer to three or four weeks.

Chinese New Year sourcing delays are the biggest scheduling risk in the calendar, but they are not the only one. Golden Week in October freezes shipping at the busiest point of the year. The five-day Labour Day break lands right on top of the Canton Fair. Even the short three-day holidays slow down email threads and customs at the wrong moment. CN Ally plans order timelines around these dates all year, and this guide lays out the full calendar: every holiday that affects your orders, how long it really lasts, and the deadlines that keep you ahead of it. For the broader ordering process, see our complete sourcing guide.

Why Chinese New Year stops factories for weeks, not days

The 2026 Spring Festival officially runs February 15 to 23, a nine-day break (the longest official Spring Festival window on record), with February 17 marking the Lunar New Year itself, the Year of the Horse. So far, so manageable. The problem is that the official calendar describes office workers in Beijing, not the factory reality in Guangdong.

Most production workers are migrants who travel hundreds or thousands of kilometers home. They leave early and return late, because tickets are scarce and family obligations stretch past the official end date. The result is a pattern that repeats every year: production slows roughly a week before the break as the workforce thins, factories close for the full nine days, and then reopening is staggered. Some lines restart the week of February 24; others do not reach normal output until the first week of March. Forwarders and inspectors recover on roughly the same schedule.

Put numbers on it. From about February 8 to early March, assume output somewhere between zero and half capacity. That is the window your orders must avoid, not the nine days on the government calendar. If you need goods to ship before the break, your production order should have been placed months earlier, and your inspection scheduled before the workforce starts leaving. One detail that matters more than it sounds: get the deposit paid before the break, not after. Suppliers restart production in order of confirmed, deposit-paid orders. A quote you never paid a deposit on goes to the back of the queue behind every importer who did. Our beginner's roadmap walks through how production lead times feed into a first order plan.

Every 2026 China holiday, ranked by sourcing disruption

China has seven statutory public holidays, and only two of them wreck schedules. Here is the full official 2026 calendar with what it actually means for your orders:

Holiday · Official 2026 dates · Real sourcing impact

  • New Year's Day: Jan 1–3 (Thu–Sat) · Minor. Offices close three days; factories barely notice.
  • Spring Festival (Chinese New Year): Feb 15–23 (Sun–Mon), 9 days · Severe. Effectively 3–4 weeks of disrupted production.
  • Qingming (Tomb-Sweeping): Apr 4–6 (Sat–Mon) · Low. A three-day pause; shipments may wait a day.
  • Labour Day: May 1–5 (Fri–Tue), 5 days · Moderate. Short break, but factories run at spring peak load.
  • Dragon Boat Festival: Jun 19–21 (Fri–Sun) · Low. Three days; email replies slow.
  • Mid-Autumn Festival: Sep 25–27 (Fri–Sun) · Low to moderate. Three days, one week before National Day.
  • National Day (Golden Week): Oct 1–7 (Thu–Wed), 7 days · High. Production stops a week; shipping is already at peak season.

A note on the make-up workdays: to build these long breaks, China borrows nearby weekends. In 2026, Saturdays like February 14 and 28, May 9, and October 10 become working days. Suppliers actually like these days for catching up, so do not be surprised when your contact answers email on a Saturday that the make-up calendar created.

Looking ahead, the 2027 calendar is not published yet (the State Council releases it in late 2026). The lunar calendar puts the 2027 Spring Festival in early February, a few weeks earlier than 2026, which compresses the post-holiday Q1 production window. Plan 2027 deposits and inventory builds with that in mind.

Golden Week: the second shipping crunch

National Day, October 1 to 7, is the holiday most importers underestimate. Factories close for the full week, which matters. But the worse pain is in shipping. October is peak season for everything bound for Christmas retail, so freight capacity was already tight before the break. The week before Golden Week, exporters rush cargo out before the ports close, which creates congestion and cargo rollovers: your container misses the sailing it was booked on and waits for the next one.

The pattern repeats one week after, when everything that could not ship gets released at once. Book freight two to three weeks ahead of Golden Week rather than days, and treat any "arrives before National Day" promise with the same skepticism you apply to Chinese New Year. If a supplier tells you goods will ship in late September, get a booking confirmation from the forwarder, not just the factory's word.

Labour Day's five days land at the worst possible moment

Labour Day, May 1 to 5, is only five days, so it looks harmless on the calendar. The timing is what makes it expensive. Spring is the season buyers place orders for autumn and Christmas, and the 2026 Canton Fair runs in three phases from April 15 to May 5, with the final phase overlapping the Labour Day break itself. Factories are at peak load taking orders from fair visitors while simultaneously losing five working days.

The practical consequence: quotes requested in April take longer than usual, and production slots for May fill up fast. If you attend the fair, do not leave order confirmations until after Labour Day unless you have a forwarder or agent chasing them. The factories that quote you on May 1st are not staffed like the factories that quote you on April 28th.

The short holidays: Qingming, Dragon Boat, Mid-Autumn, New Year's Day

Four holidays on the calendar cause delays measured in days, not weeks, and they rarely stop production at all. Qingming (April 4–6), Dragon Boat (June 19–21), and Mid-Autumn (September 25–27) each take three days off the calendar in 2026. New Year's Day (January 1–3) is similar. Offices close, customs may run a day behind, and your sales rep's replies pause, but the machines keep running.

These matter in exactly two situations. First, when they combine with something else: Mid-Autumn falls one week before National Day in 2026, so late-September staffing is thin for two full weeks. Second, when they hit a tight shipment: a container cleared on the last working day before a three-day break is a container that waits three days. Build a day or two of slack into any deadline that touches these dates, and do not plan a QC inspection for the day before one.

What the pre-holiday rush does to your freight

The holiday itself is only half the story. The rush before it is where freight quotes die. In the three to four weeks before Chinese New Year and Golden Week, every exporter in China is trying to get cargo out before the shutdown. Demand for container space spikes, and carriers respond the way they always do: rates rise, and booked containers get rolled when a vessel fills up.

This is the part where the sourcing calendar and the freight market collide. A sea-freight quote you got in November has usually expired by January. If your budget was built on a quote three months old, rebuild it before the rush starts. The same math applies to inspections: the only QC slots worth having are the ones before the workforce starts packing. An inspection report from the last working day of January tells you about the goods. An inspection booked for February 5th tells you about the scramble. Shipping and consolidation partners who run this cycle every year can usually flag when the rush is starting earlier than normal, which in tight years it does.

The same rush degrades quality. Factories trying to ship a week of orders in three days take shortcuts, and QC inspections scheduled for the final pre-holiday week often find problems that nobody has time to fix. Inspect earlier in the cycle, while there is still a workforce present to rework what fails.

How factories actually behave around a break

It helps to know what happens inside the factory at each stage, because the mechanics explain why delays linger.

Before the break: overtime and shortcuts. Factories with orders due before the holiday push overtime to clear them. Workers are thinking about their trip home. Defect rates creep up in this period. Never schedule your only pre-shipment inspection for the last production day before a holiday; if it fails, there is nobody left to do the rework.

During the break: total silence. Email, WeChat, and phone go quiet. This is normal and not a sign your supplier vanished. Do not panic-send payment requests or urgent revisions; they will sit unread. If something is genuinely urgent, a sourcing partner with local staff can sometimes reach a factory owner by phone, but do not count on it.

After the break: the slow restart. Workers return in waves, and some do not return at all, which means factories hire and train replacements in February and March. This is the period importers describe as the post-holiday quality dip, and it is a real and widely reported pattern, not superstition. For your first order after Chinese New Year, or for anything with tight tolerances, schedule an inspection you might have skipped in a normal month.

A month-by-month planning table for 2026

One table, one job: tell you what to do each month.

Month · What is happening · Your move

  • January: CNY rush builds; freight rates climb; factories slow from ~Jan 25 · Ship or freeze orders; no new production launches
  • February: Spring Festival Feb 15–23; no output · Do nothing except plan; confirm suppliers reopening late Feb
  • March: Factories restart; post-holiday quality dip; backlog clears · Resume orders; inspect more aggressively than usual
  • April: Qingming Apr 4–6; Canton Fair phases 1–2 (Apr 15–27); quoting is fast · Place Q3 production orders now; expect quick quotes
  • May: Labour Day May 1–5; fair phase 3 overlaps; peak order season · Lock production slots; confirm fair orders in writing
  • June: Dragon Boat Jun 19–21; steady production · Normal ordering; good month for factory visits
  • July–Aug: Quiet summer; some factories take short maintenance stops · Book Q4 freight early; finalize Christmas product changes
  • September: Mid-Autumn Sep 25–27; pre-Golden-Week cargo rush · Confirm all Golden Week shipments are booked
  • October: Golden Week Oct 1–7; peak-season freight · Expect a week of silence; shipments resume mid-month
  • November: Production normal; freight rates still elevated · Final Christmas-season production; no new product launches
  • December: Order book thins; suppliers quote faster · Place Q1 orders now to beat the next CNY rush

The single most expensive row in that table is January. Every year, importers who meant to order "before the holiday" discover that January capacity was already gone in December.

Your Chinese New Year ordering deadline, worked backwards

Abstract advice like "order early" is useless without numbers, so here is the math for a typical sea shipment, worked backwards from the 2026 holiday:

  • February 8: factories begin winding down. Goods must be finished, inspected, and at the port by this date, realistically the first week of February to be safe.
  • Subtract ocean freight: 30–40 days to most US and EU ports, plus port handling. So the container should leave China by roughly early January.
  • Subtract production: 30–45 days for most consumer goods. That puts the order placement in mid-November.
  • Subtract quoting and sampling: 2–4 weeks. You need to be requesting quotes and confirming samples in October.

That is the honest version of "order before Chinese New Year." For a normal sea-freight order, October. For air freight, December can work, but the pre-holiday air capacity crunch means you will pay for the privilege. If your goods must reach your customers by March, and your order was placed in January, the calendar has already decided your outcome before the factory did.

Frequently asked questions

How long do Chinese factories actually close for Chinese New Year?

The official 2026 break is nine days, February 15 to 23, but most factories are effectively offline for three to four weeks. Production slows from about a week before the holiday and does not return to full capacity until early March, after the workforce has traveled back.

When should I place orders to avoid Chinese New Year delays?

For sea freight, place production orders by October or November for the holiday season in February. Air freight can work with December orders, but expect capacity pressure and higher rates. Anything placed in January arrives after the holiday.

Do shipping rates go up before Chinese New Year?

Yes. Exporters rush cargo out before the break, container demand spikes, and carriers raise rates while rolling booked containers when vessels fill. Quotes from months earlier usually expire; refresh freight pricing before the rush starts.

Is Golden Week as bad as Chinese New Year for sourcing?

For production, no: Golden Week stops factories for one week, not several. For shipping, it is the second-hardest crunch of the year, because it lands in peak season and the cargo rush before and after the break congests ports.

Can I place orders during the holiday break?

You can send the order, but nothing will happen until suppliers reopen. Communication is effectively silent during Spring Festival. Confirm orders before the break so they sit at the front of the production queue when the factory restarts.

Which Chinese holidays matter least for importers?

New Year's Day (January 1–3), Qingming (April 4–6), Dragon Boat (June 19–21), and Mid-Autumn (September 25–27) each cause only brief pauses. They slow email and customs by a day or two, not production. The exception is Mid-Autumn in 2026, which sits one week before Golden Week.

Build the calendar into every order plan

Holiday math belongs at the top of every purchase order, not discovered after the deposit is paid. The habit is simple: whenever you plan an order, check the next two holidays on the calendar, work backwards through production and freight, and add the buffer that the pre-holiday rush always eats. It costs nothing to plan in October and costs everything to remember in January.

If you would rather not run this calendar in your head, that is part of what a sourcing partner does. We keep order timelines aligned with the real factory calendar, order before the rush, and adjust shipping plans around every break. Email hi@cnally.com or get in touch and we will sanity-check your next order against the dates that actually matter.

Need help sourcing this kind of product?

Our team handles supplier verification, QC inspections, and logistics every day.

Get a Free Quote

Ready to source smarter from China?

Tell us what you want to source. We'll reply with vetted factory options and pricing within 24 hours — free, no obligation.